基础和结构
Foundation&structure |
|
PHC桩、现浇混凝土框——筒结构
PHC pilc and Concrtet cast frame |
| |
外立面
Exterior |
|
玻璃幕墙 (中空+LOW-E玻璃)
Double glazing curtain wall:(Hollow+Low-E Glass) |
| |
电梯
Elevator |
|
进口三菱电梯
Imported Mitsubishi elevator |
| |
停车系统
Parking
|
|
A区生活大卖场及办公楼各一套地下停车库出入口管理系统
D区独立地下停车库出入口管理系统
Zone A: Access control system to supermarket and underground garage;
Zone B: separate garage access system |
| |
保安系统
Secutrity system
|
|
门禁门磁系统(地下一层、一层直接通室外的公共通道门、物业办公室及重要机房)
闭路电视监控系统(主要出入口、车库出入口、楼层内主要公共通道、电梯轿厢、电梯前厅)
电子巡更系统
Integrated security access system (Entrance guard and access control for basement level one,ground floor level,property management office and critical machinery and equipment rooms)
CCTV monitoring system(Surveillance cameras for major passages and key designated areas)
electronic patrolling system |
| |
通讯系统
Communication system |
|
综合布线系统(电话、数据)
Integrated Cabling System(telephone,data) |
| |
智能化系统
Intelligent systems
|
|
楼宇设备自控系统
公共广播系统(公共区域)
Building Auto Control System (BACS)
Broadcasting System (public area) |
| |
|
层高
层楼板至楼板距
Ceiling systems
|
|
A区 大堂:6米;标准层:3.85米(楼板至楼板距)
D区 大堂:9米;标准层:3.8米 (楼板至楼板距)
Zone A (lobby:6m; standard floor:3.85m; slab to slab)
Zone D (lobby:9m; standard floor:3.8m; slab to slab)
|
|
停车
Parking |
|
机动车806个;自行车1,580个(整个项目)
806 car park units, 1,580 bicycle park units (for the whole project) |
| |
|
装修
Decoration |
|
公共部位全部精装修:石材墙、地面走廊地毯
Luxurious decoration in public area |
| |
业主提供设施
Land lord‘s provisions
|
|
地坪:细石混凝土找平
墙面:腻子批平
天花:矿棉板吊顶
空调:采用中央空调
通讯:电话、信息端口配置道楼层信息箱
供电:到楼层配电箱
Floor: screed floor
Wall: High quality paint with plaster skim
Ceiling: Acoustic ceiling
Air-conditioning: Central HVAC system
Communication: phone line and information port in the connection panel of the floor
Electricity: Connected to the power distribution panel for each floor
|